FACTORY SOURCING HUB — PICTURE FRAMES, WALL ART & SEASONAL DECOR SOURCING Page reference: 0445 Send to: kunhuow@gmail.com Reply email: Product / reference: Quantity per model and variation: Sales market / intended user: Material / size / performance: Logo / artwork: Packaging / labels / carton requirements: Samples / testing / documents: Target budget / timing / shipping basis: Additional requirements: REFERENCE OPTIONS 0445-01 | Photo-wall and coordinated frame projects Original formats: Combination and individual photo frames, photo walls and decorative picture frames; Approval brief: Current opening/overall dimensions, glazing/backing, finish, hardware and pack 0445-02 | Plastic, foam-frame and moulding projects Original formats: Plastic frames, foam picture frames and frame mouldings; Approval brief: Current resin/foam declaration, profile dimensions, joints, finish and packing 0445-03 | Decorative picture and frame-assembly enquiries Reported process directions: Image/photo-paper cutting; frame-moulding foil stamping/embossing; unframed-picture stretching and stapling; Approval brief: Current construction, finish, dimensions and artwork rights 0445-04 | Christmas-ball surface and pattern projects Reported process directions: Decorative-ball pattern application, coated finishes and cap assembly; Approval brief: Current substrate, dimensions, coating/decoration, hanging fit and evidence 0445-05 | Cultural-pattern ornament and paper-cut-art projects Reported design directions: Blue-and-white porcelain-inspired Christmas-ball patterns and paper-cut-inspired decorative pictures; Approval brief: Current actual substrate/process, design rights, sample and pack 0445-06 | Recycled-plastic composite development enquiries Reported material direction: Reprocessed-plastic / polymer-composite material-development projects; Approval brief: Current formulation, content declaration, processing and finished-item evidence This is a sourcing brief, not a quotation, certification, stock confirmation or guaranteed delivery schedule. Confirm the model-specific specification, minimums, sample approval, costs, lead time and contract terms before ordering.