FACTORY SOURCING HUB — PHOTO FRAMES, MIRRORS, DECORATIVE ART, WALL PANELS & FLOOR FINISH SOURCING Page reference: 0475 Send to: kunhuow@gmail.com Reply email: Product / reference: Quantity per model and variation: Sales market / intended user: Material / size / performance: Logo / artwork: Packaging / labels / carton requirements: Samples / testing / documents: Target budget / timing / shipping basis: Additional requirements: REFERENCE OPTIONS 0475-01 | Photo-frame and mirror collections Named directions: Photo frames; PS, art, metal and wooden mirror routes; Approval brief: Current materials, insert/overall dimensions, glazing or mirror specification, backing and fixing 0475-02 | Decorative-picture and art projects Core direction: Decorative paintings and pictures; Approval brief: Current artwork rights, image process/substrate, format, finish, framing and protective pack 0475-03 | Square MDF-slat panel reference Published face size: 60 × 60 cm; Construction: MDF slats bonded to a high-density acoustic base; Appearance: Wood-grain surface and linear slat pattern; Approval brief: Current thickness/base composition, mounting method and required acoustic/fire evidence 0475-04 | PS skirting and baseboard reference Published article: PS skirting board/baseboard; Approval brief: Actual profile drawing, section dimensions, length, finish, fixing and corner/end pieces 0475-05 | Fluted WPC interior-wall reference Material direction: Wood-plastic composite; Published form: Interior wall cladding with a fluted/grooved, hollow-grille profile; Approval brief: Actual cross-section, dimensions, composition, fixing and matched use evidence 0475-06 | White-oak-look SPC flooring reference Published material direction: Stone-plastic composite using limestone powder and PVC; Appearance: White-oak decorative look; Approval brief: Current plank dimensions, layer structure, wear layer, joint/backing and installation documents This is a sourcing brief, not a quotation, certification, stock confirmation or guaranteed delivery schedule. Confirm the model-specific specification, minimums, sample approval, costs, lead time and contract terms before ordering.