Gasoline generators
Small two-stroke and single-cylinder four-stroke sets, different open frames, tanks, panels, starting options and larger twin-cylinder configurations.
Enquire about this range ↗Power equipment & material handling
Compare gasoline, diesel and inverter generators, engines, powered water pumps, pressure washers, forklifts and warehouse handling equipment with model-specific procurement support.
Manufacturing, product documents and order conditions depend on the model and supply route selected for your project.
Start with a product reference, intended use and estimated quantity. We bring product selection, sample questions and quotation details into one conversation.
Email your reference image ↗Choose a focused product or discuss a coordinated assortment. Each direction can be developed into a more specific model and packaging brief.
Small two-stroke and single-cylinder four-stroke sets, different open frames, tanks, panels, starting options and larger twin-cylinder configurations.
Enquire about this range ↗Compact enclosed, wheeled and open-frame directions, with voltage/frequency and housing variations kept separate.
Enquire about this range ↗Open economy and enclosed air-cooled sets, inverter diesel versions and transfer-system configurations requiring a complete electrical schedule.
Enquire about this range ↗Portable inverter generation/welding packages; welding current versions, duty cycle and simultaneous-use limits need confirmation.
Enquire about this range ↗Small and larger single-cylinder gasoline units, a twin-cylinder gasoline engine and a vertical direct-injection diesel engine.
Enquire about this range ↗Gasoline and diesel pump configurations with distinct connection, flow, head, suction and engine references.
Enquire about this range ↗Gasoline axial-pump, gasoline plunger-pump and diesel plunger-pump directions; match pressure, flow and nozzle to the actual cleaning task.
Enquire about this range ↗Industrial electric-washer and lithium battery wash-gun enquiries, with separate supply and performance approval.
Enquire about this range ↗Three-support and four-wheel counterbalance constructions across separate load, battery and load-centre combinations.
Enquire about this range ↗Gasoline/LPG and diesel counterbalance directions, plus rough-ground constructions and heavier loads requiring exact engine and mast approval.
Enquire about this range ↗Pedestrian and larger pallet transport, rider/walkie mast stackers, a rider stacker and a reach-truck construction.
Enquire about this range ↗Equipment-specific part identification, compatible drawings, labels, panels, packing and agreed evaluation or inspection requests.
Enquire about this range ↗Use these options to describe what you are buying. The public references identify your enquiry; the final model and specification are confirmed before an order.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare this separately listed frame against the current confirmed electrical schedule; do not infer peak output from the product heading.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
This listed construction has conflicting output information. Compare the housing, starting method and current approved rating before selection.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the separate generation and welding modes, rated current version, electrode range and duty-cycle data. Simultaneous full outputs are not implied.
Compare the alternative housing and starting arrangement with the required welding process.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Frequency-specific outputs are different builds; do not pair an output with an unrelated voltage column.
Compare the smaller tank and open-frame arrangement with the exact load and route.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Confirm the selected electrical nameplate, engine and transfer arrangement. Output data needs current clarification.
Compare the separate electric-start articles and their actual phase arrangements.
Compare the separate electric-start articles and their actual phase arrangements.
Compare the separate electric-start articles and their actual phase arrangements.
The phase and apparent-power columns need the actual power-factor and current confirmation.
Confirm which output belongs to each alternator/phase version before quoting.
Use the selected article schedule rather than converting the product-heading wattage into a rating.
Confirm the selected electrical nameplate, engine and transfer arrangement. Output data needs current clarification.
Keep the three columns paired and confirm each current engine and emissions configuration.
Compare shaft geometry, mounting, rotation, starter and filter arrangement before fitting an engine to equipment.
Request shaft-end and mounting drawings and the actual rated-duty data.
Match the horizontal output shaft, cooling, mounting and governor to the driven equipment.
The two engine-speed columns have different continuous and maximum powers.
Confirm the duty point against the pump curve, water condition, hose length and priming arrangement. Published head, suction and flow labels are not a guarantee of simultaneous maxima.
Confirm the duty point against the pump curve, water condition, hose length and priming arrangement. Published head, suction and flow labels are not a guarantee of simultaneous maxima.
Confirm the duty point against the pump curve, water condition, hose length and priming arrangement. Published head, suction and flow labels are not a guarantee of simultaneous maxima.
Confirm the duty point against the pump curve, water condition, hose length and priming arrangement. Published head, suction and flow labels are not a guarantee of simultaneous maxima.
Confirm the duty point against the pump curve, water condition, hose length and priming arrangement. Published head, suction and flow labels are not a guarantee of simultaneous maxima.
Confirm the duty point against the pump curve, water condition, hose length and priming arrangement. Published head, suction and flow labels are not a guarantee of simultaneous maxima.
Confirm the duty point against the pump curve, water condition, hose length and priming arrangement. Published head, suction and flow labels are not a guarantee of simultaneous maxima.
Confirm the duty point against the pump curve, water condition, hose length and priming arrangement. Published head, suction and flow labels are not a guarantee of simultaneous maxima.
Compare pump, nozzle, hose, water supply and engine duty. Confirm current pressure/flow test conditions; some source unit conversions require clarification.
Compare pump, nozzle, hose, water supply and engine duty. Confirm current pressure/flow test conditions; some source unit conversions require clarification.
Compare pump, nozzle, hose, water supply and engine duty. Confirm current pressure/flow test conditions; some source unit conversions require clarification.
Compare pump, nozzle, hose, water supply and engine duty. Confirm current pressure/flow test conditions; some source unit conversions require clarification.
Compare pump, nozzle, hose, water supply and engine duty. Confirm current pressure/flow test conditions; some source unit conversions require clarification.
Compare pump, nozzle, hose, water supply and engine duty. Confirm current pressure/flow test conditions; some source unit conversions require clarification.
Compare pump, nozzle, hose, water supply and engine duty. Confirm current pressure/flow test conditions; some source unit conversions require clarification.
Compare pump, nozzle, hose, water supply and engine duty. Confirm current pressure/flow test conditions; some source unit conversions require clarification.
Compare pump, nozzle, hose, water supply and engine duty. Confirm current pressure/flow test conditions; some source unit conversions require clarification.
Verify input power, motor, controls, water supply and the pressure/flow operating point.
Assess portability, water source, nozzles, battery and actual test duty.
Match the current battery, charger, mast, fork and tyre arrangement to the load and site. Nominal rating is not residual capacity at every height; environmental suitability needs separate approval.
Match the current battery, charger, mast, fork and tyre arrangement to the load and site. Nominal rating is not residual capacity at every height; environmental suitability needs separate approval.
Match the current battery, charger, mast, fork and tyre arrangement to the load and site. Nominal rating is not residual capacity at every height; environmental suitability needs separate approval.
Match the current battery, charger, mast, fork and tyre arrangement to the load and site. Nominal rating is not residual capacity at every height; environmental suitability needs separate approval.
Match the current battery, charger, mast, fork and tyre arrangement to the load and site. Nominal rating is not residual capacity at every height; environmental suitability needs separate approval.
Match the current battery, charger, mast, fork and tyre arrangement to the load and site. Nominal rating is not residual capacity at every height; environmental suitability needs separate approval.
Match the current battery, charger, mast, fork and tyre arrangement to the load and site. Nominal rating is not residual capacity at every height; environmental suitability needs separate approval.
Match the current battery, charger, mast, fork and tyre arrangement to the load and site. Nominal rating is not residual capacity at every height; environmental suitability needs separate approval.
Match the current battery, charger, mast, fork and tyre arrangement to the load and site. Nominal rating is not residual capacity at every height; environmental suitability needs separate approval.
Match the current battery, charger, mast, fork and tyre arrangement to the load and site. Nominal rating is not residual capacity at every height; environmental suitability needs separate approval.
Match the current battery, charger, mast, fork and tyre arrangement to the load and site. Nominal rating is not residual capacity at every height; environmental suitability needs separate approval.
Match the current battery, charger, mast, fork and tyre arrangement to the load and site. Nominal rating is not residual capacity at every height; environmental suitability needs separate approval.
Match the current battery, charger, mast, fork and tyre arrangement to the load and site. Nominal rating is not residual capacity at every height; environmental suitability needs separate approval.
Use the detailed gasoline/LPG power description; approve the engine, fuel arrangement, emissions documents and ventilation requirements. Other gas-fuel claims require confirmation.
Use the detailed gasoline/LPG power description; approve the engine, fuel arrangement, emissions documents and ventilation requirements. Other gas-fuel claims require confirmation.
Use the detailed gasoline/LPG power description; approve the engine, fuel arrangement, emissions documents and ventilation requirements. Other gas-fuel claims require confirmation.
Use the detailed gasoline/LPG power description; approve the engine, fuel arrangement, emissions documents and ventilation requirements. Other gas-fuel claims require confirmation.
Compare the exact engine and transmission column, mast, tyres and fork dimensions. Confirm the destination engine documentation and current capacity chart.
Compare the exact engine and transmission column, mast, tyres and fork dimensions. Confirm the destination engine documentation and current capacity chart.
Compare the exact engine and transmission column, mast, tyres and fork dimensions. Confirm the destination engine documentation and current capacity chart.
Compare the exact engine and transmission column, mast, tyres and fork dimensions. Confirm the destination engine documentation and current capacity chart.
Compare the exact engine and transmission column, mast, tyres and fork dimensions. Confirm the destination engine documentation and current capacity chart.
Compare the exact engine and transmission column, mast, tyres and fork dimensions. Confirm the destination engine documentation and current capacity chart.
Compare the exact engine and transmission column, mast, tyres and fork dimensions. Confirm the destination engine documentation and current capacity chart.
Compare the exact engine and transmission column, mast, tyres and fork dimensions. Confirm the destination engine documentation and current capacity chart.
Compare the exact engine and transmission column, mast, tyres and fork dimensions. Confirm the destination engine documentation and current capacity chart.
This separately listed diesel construction requires a current readable specification and load chart before selection.
Review the separate listed capacity directions against a current model-specific technical sheet.
Request a current model schedule and capacity chart for the intended load class, engine and mast.
Review ground bearing, terrain, slope, load stability and the exact tyre/drive configuration. A rough-ground description does not establish suitability for every off-road surface.
Review ground bearing, terrain, slope, load stability and the exact tyre/drive configuration. A rough-ground description does not establish suitability for every off-road surface.
Match fork width and entry to the pallet, floor, load and route.
Compare the pedestrian layout and battery package with pallet clearances. Conflicting fork-height and speed fields require a current drawing.
Compare the mast and operator layout for pallet stacking. Approve load capacity at the selected height.
Confirm the fork length and lowered-height drawing before choosing the pallet interface.
Assess the operator platform, safety functions and actual mast/load chart.
Confirm residual capacity at height, racking layout, tyre/floor and battery handling requirements.
Send the exact equipment model, serial number, drawing or photograph and required quantity. Confirm interchangeability instead of ordering by appearance.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Compare the exact power version, starting method, outlet panel, load demand and packed dimensions. Output alternatives are separate configurations; confirm the current electrical schedule.
Match the three columns by engine and alternator; the additional operating-power label is not treated as another continuous rating.
Approve the mast, battery/charger, fork and tyre arrangement with the load chart.
Specify the intended continuous output, phase, current and engine. A current signed schedule is required for this separately listed range.
These are separate published product references, subject to a current confirmed configuration. Rated/continuous and maximum/short-time output are different; kW and kVA are not interchangeable. Voltage, phase and frequency options require a matched alternator/panel schedule. Pump flow, head and suction are not simultaneous maxima. Forklift capacity requires its exact load centre, mast and residual-capacity chart. Commercial and compliance terms are confirmed for the selected article. A/B/C configurations follow actual columns within that card only; each semicolon position belongs to that configuration, while a shared value applies across the listed columns. A dash means missing or withheld data. Slash values retain their source grouping and are not an approved combination across voltage, frequency, engine or phase. All figures are catalogue references; nominal displacements and unit pairs are not exact conversions or measurements. Missing units remain unstated. Conflicting electrical, pressure, engine and geometry blocks are withheld. Obtain current signed data, complete electrical nameplates, pump curves and selected load charts. Optional features require a current build list. Platform or fork lift measures require their drawing datum; grade references do not define a safe working slope.
Focus the sourcing conversation on the features, materials and production details that make a difference to your product range.
We coordinate comparisons of rated output, peak definition, frequency, voltage, phase, engine, starter and tank. This helps avoid combining attractive figures from different versions.
Discuss the generator load profile, pump duty point, cleaning pressure/flow or handling load and route. Where a field is unclear, request the current technical schedule before selection.
A project can include generation, water movement, cleaning, engines, handling equipment and corresponding parts. Inspection and transport plans remain specific to each article.
Bring artwork, reference samples and a target cost. The available process, minimum quantity, sample charges and development scope are reviewed for the chosen option.
Submit voltage, frequency, phase, outlet panel, starter, alternator and control needs, or shaft/mounting and hose/pump interfaces. Optional combinations require engineering approval.
Specify capacity, load centre, mast, forks, tyre, fuel/battery, charging and site requirements. Environmental and engine-emission claims require the exact selected configuration.
Discuss agreed markings, artwork, colour, pack format, documentation language and an evaluation-unit plan. MOQ, sample costs, production timing, warranty and parts terms are confirmed in writing.
Agree which product characteristics need testing and how the approved sample relates to the bulk order.
Agree identification, dimensions, materials and critical component checks against approved drawings. Do not substitute a similar-looking engine, controller, alternator or battery.
Define generation load and electrical checks, pump duty measurements, washer test conditions or handling/braking/lifting checks as appropriate. Set methods and acceptance criteria in advance.
Request inspection records, identification photographs, packing checks and agreed operating instructions. Source production/QC descriptions do not establish a blanket certification or a universal inspection rate for this service.
Test capability is a starting point for the inspection plan. Request the method, applicable model and results needed for your order.
Documents and suitability are checked at article level. We act as an independent sourcing service; source-factory certificates, facilities and service networks are not credentials or assets of this website.
State the sales market, intended users and required files in your first enquiry. Current validity and scope are checked for the selected supplier and product; a category description does not certify every item.
Share your document requirements ↗Your sales channel changes the assortment, packaging and quality priorities. Tell us the intended use as well as the product name.
Compare the load and start-up demand, electrical arrangement, ventilation, operating location and required documentation before selecting a generating set.
Supply water condition, duty point, suction and hose details, or cleaning target, water supply, nozzle and operating duty.
Share pallet/load geometry, required lift and reach, floor, slopes, aisles, working environment and power/fuel constraints.
Samples, commercial terms and responsibilities are agreed for the project. Use the same product and packing specification when comparing quotations.
Product, reference image, quantity, sales market and timing.
Review configuration, materials, sample scope and relevant documents.
Agree artwork, packaging, sample, testing and inspection criteria.
Set price, payment, production, delivery and defect remedies in writing.
Practical answers about this sourcing direction, customization and the reference options. Your agreed specification and written quotation determine the actual order.
Gasoline, diesel and inverter generators, generation/welding packages, independent engines, engine-powered pumps, pressure washers, battery wash guns, forklifts, pallet/stacking/reach equipment and compatible-parts enquiries.
Yes. State continuous load, starting demand, voltage, phase, frequency, sockets, operating duty and start/control requirements. Each output and engine combination needs a confirmed schedule.
No. Rated or continuous output and short-time maximum output have different duties. Apparent power in kVA also needs power factor and phase data; do not treat a heading as a complete electrical rating.
Provide liquid condition, required flow at head, suction lift, hoses, duty and fuel choice. Request the current pump curve; separately published flow, head and suction figures do not guarantee one operating point.
Give the cleaning task, water supply, pressure/flow at the operating point, nozzle, hose, duty and preferred power type. Confirm the same pressure units and test conditions across the quotation.
Capacity is a starting point. Load centre, load dimensions, mast, lift height, attachments, route and floor determine the approved configuration and residual capacity. Fuel and battery packages also need separate confirmation.
We can coordinate those requests. The selected article, drawings, artwork, pack plan, evaluation cost, quantity, current lead time and written service terms must be agreed; no fixed terms are assumed here.
List each task and quantity, destination, current technical requirements, power or fuel preference and inspection/document needs. Attach drawings or photographs and identify exact models/serials for replacement parts.
Factory Sourcing Hub handles this enquiry as an independent sourcing and trading service. The product route, supplier suitability, sample scope and order responsibilities are agreed for the actual project.
Send the product reference, quantities per variation, customization and packaging. Prices, minimums, sample charges and delivery dates are confirmed in a current quotation; the page is not a live inventory or price feed.
Yes. State whether you need a reference sample, a customized sample or development work. Agree the sample cost and shipping, approval specification, inspection plan and remedy for non-conforming goods before the bulk order.
Reference images, drawings, logo artwork and a product list are useful. Include quantities, the intended users and sales market, packaging, required documents and timing. After submitting the form, email attachments to kunhuow@gmail.com with your enquiry reference.
A reference picture or a short description is enough to begin. Add the details you already know; the optional fields help make the follow-up more useful.
Download the enquiry checklist ↓
Independent sourcing and trading service. Supplier choice, service costs and order conditions are discussed for your project.
Product selection, customization, samples and quotation enquiries.
Information basis: published product information reviewed . Reference details support a sourcing discussion. Current supply, samples and product-specific documents are confirmed for the selected item.